News

Stormwater Maintenance on US 285 Begins Sept. 8

Post Date:09/04/2025

The City of Englewood’s Stormwater Division will conduct maintenance work along US 285/Hampden the week of September 8. Crews will be cleaning stormwater inlets and pipes to keep the drainage system functioning properly.A rolling traffic control plan will be in place during work hours, so drivers should expect lane closures and potential delays.

Maintenance Schedule:

  • Mon 9/8: WB – South Corona St. to South Logan St. (9 a.m.-2 p.m.)
  • Tues 9/9: WB – South Logan St. to South Inca St. (9 a.m.-2 p.m.)
  • Wed 9/10: EB – South Jason St. to South Galapago St. (10 a.m.-2 p.m.)
  • Thurs 9/11: EB – South Fox St. to South Broadway (10 a.m.-2 p.m.)
  • Fri 9/12: EB – South Broadway to South Clarkson St. (9 a.m.-2 p.m.)

Benefits to the Community:

  • Helps prevent flooding on streets and sidewalks
  • Protects local waterways by keeping stormwater clean
  • Reduces costly damage to roads and infrastructure
  • Improves safety for drivers and pedestrians

Residents and commuters are encouraged to plan ahead, allow extra travel time, and follow traffic control measures during the maintenance period.

Learn more about Englewood Stormwater here.

Return to full list >>